Test Capacity

Test Capability

 In order to ensure the quality of our products, it is essential to conduct the following test at our facility before shipping.

 
 

Routine Tests(At our Facility)

  DC Resistance

  Inductance

  Power Losses

  Turn to Turn Test

  High Frequency Impedance

 
 
 

Type Tests

  Temperature Rise Test(at our facility)

  Lightning Impulse Test(at our facility)

  Chopped Wave Test(at our facility)

  Switching Impulse Test(at our facility)

 

  • Sound Level Measurement(3rd Party)
 
 
 

Special Tests

  • Radio Influence Voltage (RIV)(3rd Party)
  • Short Circuit Test(3rd Party)
 

 

Lightning Impulse Test (In/Out Door)

Testing for: Dry BIL/2500 kV, Chopped /2750 kV, Testing Reactor: 1100kV (5455A) SMR

 

3
Out Door

 Equipment: 4.4 (4000kV) MV Outdoor Impulse Generator (for UHV impulse test)

Dry BIL @ 2500 kV

Chopped @ 2750 kV

 Reactor: 1100kV (5455A) SMR

 Location: TEEE Test Lab

 

Indoor Test
1MV Indoor Impulse Generator - 001
1MV Indoor Impulse Generator
Indoor HIPOT Test Transformer 1000 kV -
Indoor HIPOT Test Transformer (1000 kV)
Final Acceptance Test

 

Testing for: SMR Reactor at 800kV/6250A by Lab of China Electric Power Research Institute(CEPRI) (Under Rain or Grease Conditioning, 1 minutes duration and at 120% of rule of thumb)

 

4
Test: Wet DC withstand voltage 1300kV

Reactor: 800kV (6250A) SMR

Test Duration: 2 hours

Location: Beijing Test Lab (EPRI)

 

Temperature Rise Test

 

Capacitor bank:
AC Temperature Rise Test
AC Temperature Rise Test
(Up to 500kV level)
DC Temperature Rise Test -
DC Temperature Rise Test
(Testing for SMR at 800kV/6250A)